SECTOR-SPECIFIC SOLUTIONS · ENERGY & RENEWABLES

Incentive and financing
structure for energy investments.

Renewable energy, natural gas and energy efficiency investments are subject to different incentive mechanisms. Without building the right incentive structure at every stage — from licensing to production — the process cannot be completed.

2012/3305 Decree Scope
Large-Scale Investment Status
R&D + Production Integration
FROM VISION TO VALUE
AKBAŞ ADVISORY

Sector Profile

Turkey's energy transition offers a broad investment area ranging from renewable energy power plants to smart grid technologies, energy storage systems and efficiency software. These investments can be supported by STB incentive certificates, TÜBİTAK support programmes and financial structuring instruments. However, licensing stage, capacity size and technology type directly affect incentive status; it is therefore essential to structure incentives before making the investment decision.

Incentive Applicability Table

Investment Type Incentive Route Priority
Solar / Wind power plant STB Regional Investment Incentive High
Energy storage technology STB Strategic + TÜBİTAK 1501 High
Energy efficiency equipment R&D 5746 R&D Centre or TÜBİTAK 1507 Medium
Hydroelectric power plant STB Large-Scale Investment Incentive Medium
Smart grid software TÜBİTAK 1511 or Design Centre Medium

Key Legal References

2012/3305

Decision on State Aids in Investments

Regional and Large-Scale Incentive statuses, energy sector applications

5346

Law on the Use of Renewable Energy Resources for the Purpose of Generating Electrical Energy

Licensing and connection processes, integration with incentive certificate

5627

Energy Efficiency Law

Support mechanisms and R&D scope in energy efficiency projects

Incentive Profile

Energy Sector Quick Reference

Priority Incentive Regions Region 3 and above, Within OIZ
Typical Incentive Type Regional / Large-Scale / Strategic
Average Process Duration 3 to 9 months (subject to project scale)
R&D Eligibility
Yes (in technology projects)
Licence Requirement
Mandatory for plant investments
Combined Structure Incentive certificate + R&D together possible
Request a Preliminary Analysis

Process Management

How does the incentive process
work in energy investment?

From licence application to production stage, from incentive certificate follow-up to completion visa — we manage every step together.

01

Investment Profile & Licence Status Assessment

The energy source, installed capacity target and current licence stage are examined. Pre-licence, licence or licence-exempt installation status directly determines the timing of the incentive application.

02

Region & Capacity Analysis

The plant location and incentive region calculation are carried out. The impact of OIZ-inside vs. OIZ-outside location on support rates is analysed, and incentive values for alternative locations are compared.

03

Incentive Type & Investment Amount Optimisation

Regional, Large-Scale and Strategic status comparison is performed. If an R&D component exists, it is planned together with TÜBİTAK programme. Investment amount and scope are configured to maximise incentive value.

04

Ministry Application & Follow-Up

The incentive certificate application is prepared and followed up during the Ministry process. Necessary corrections and additional information requests are addressed on time. Once the certificate is obtained, the incentive schedule is monitored.

05

Production Stage Monitoring & Reporting

Completion visa procedures, initiation of tax reduction application and VAT refund follow-up are managed. Extension needs for the incentive certificate are identified in advance to prevent disruptions.

Frequently Asked Questions

Common questions about
energy investments.

Which STB incentive type does a solar power plant investment fall under?

Solar power plants may be assessed under General, Regional or Large-Scale Incentive depending on investment amount and location region. Minimum investment amount and sector list eligibility are verified first. Regional Incentive is the most commonly applied status; location selection is of strategic importance at this stage.

Can energy storage investments qualify for strategic incentive?

Yes. Energy storage technologies may meet Strategic Investment Incentive criteria since Turkey's import dependency in this field continues. A minimum investment of TRY 50 million and documentation of import dependency rate are the basic conditions for application. Since this status offers the most comprehensive support package, it is recommended to evaluate it first for large-scale storage projects.

Can investment incentive and R&D support be used at the same time?

Yes, it is possible. The physical investment component (power plant, manufacturing facility) can be supported by STB certificate, and the technology development component separately by TÜBİTAK programme. However, submitting the same expenditure item to both mechanisms simultaneously is prohibited. If expense segregation is not structured correctly from the outset, audit risk arises.

What happens if the deadline in the investment incentive certificate is not met?

If the investment completion deadline in the certificate is exceeded, an extension application must be made. If this application is not made before the deadline expires, the certificate risks cancellation and the supports benefited from may need to be repaid. Extension applications are common in energy investments due to delays in construction and connection processes; monitoring is therefore critical.

How does region selection affect the incentive rate for an energy power plant?

Location selection for energy plants must be evaluated both in terms of solar/wind potential and incentive region. Tax reduction rate and SGK support duration reach the highest values in regions 5 and 6. Projects within OIZs benefit from one-region-higher support. In provinces with high solar potential but low incentive regions, a net calculation of both factors is required.

energy investment analysis

Let us map the incentive and financing landscape for your project.

A region-based incentive comparison is carried out using your energy source, installed capacity and location.

Response within 48 hours
Confidentiality commitment
Meeting with Nilüfer Akbaş
Request a Meeting

Bir sonraki adım

Let us build the right incentive structure
for your energy investment.

We manage every step together from licence stage to completion visa.